This infrastructural building is located in a residential area in Zollikon, southeast of Zurich. The building is integrated into the landscape without interrupting the view from the square above onto Lake Zurich. A façade folded into the hill and wrapped around the delivery entrance disguises the real shape and size of the power supply installations for 2000 households.
| project period | 01/2006 - 07/2007 |
|---|---|
| use | Infrastructure |
| floor area | 150 m² |
| building volume | 600 m³ |
| budget | 1.4 Mio. CHF |
| client | Zollikon Comunal Services |
| commission | Direct Comission, Study |
| project status: | built work |
